Project Cases

Guoxin is a prominent hydraulic jacking solutions provider in China. We have served a large number of customers involved in various construction and engineering projects, such as storage tank top-down construction, water tower construction, communication lifting construction, settler lowering construction, chimney stalk and cooling tower slip forming construction, etc. Our hydraulic jacking equipment including our slipforming jacks and hydraulic strand jacks performed exceptionally well in these projects and have created a solid reputation within the industry.

Cases

  • Absorption tower jacking construction
  • 200t strand jack is working in a construction in Nanchong city, Sichuan Province
  • 60t strand jack is working horizontally to pull a heavy load
  • Steel inner tank top-down construction We completed the top-down construction of a 240m 620 ton steel inner tank at the China Resources Caofeidian Power Plant within 40 days.
  • Slip forming construction of a hyperbolic cooling tower in Cangzhou Power Plant with one set of hydraulic power packs and 120 sets of YSQD-60-50 slipform jack
  • Top-down construction of a 100,000m3 storage tank in northwestern China's Xinjiang Uygur Autonomous Region.
  • Slipforming construction of a 30,000m3 asphalt storage tank with a height of 34m and a diameter of 34m. With our slipform jacks, this construction was completed in only 20 days.
  • Storage tank construction in the Republic of Belarus
  • 62 sets of 45t and 75t strand jacks used for lifting boiler plates up to 245m in India.

Engineering Construction
1. Settler lowering construction of PetroChina Daqing Petrochemical Company.
2. 30,000m3 storage tank construction for an oil refinery in Jiujiang city of Jiangxi province.
3. Lifting the upside down cone water tower of 320 tons up to 38m for installation for Handan Iron & Steel Group Co., Ltd.
4. Lifting a 180 ton communication tower up to 76m in the construction of the Shenyang Superior People's Court, Liaoning province.
5. 210m Chimney hydraulic slip-form construction of Huaneng Dandong Power Plant.
6. In 2004, 180 sets of hydraulic jacks were used to construct 78 storage tanks of various sizes in Huizhou city, Guangdong province.
7. 50m horizontal movement of oil refining equipment in the Qilu petrochemical refinery was completed using our strand jacks.
8. The construction of a steel inner tank in the China Resources Cangzhou Power Plant with a height of 210m and a weight of 560 tons was finished within 38 days.
9. 40 days were used for the construction of a chimney's 240m high and 780t inner tank in the Huixian power plant of Xinxiang City, Henan Province.
10. The inner cylinder of a 180 meter high and 540 ton chimney in the Xuzhou power plant of Jiangsu Province was constructed using our hydraulic strand jacks in 30 days.
11. The construction of a 50,000m3 double layer cryogenic tank which has a diameter of 60m, a height of 48m, and a weight of 1600 tons in Dongguan city, Guangdong province was successfully completed by the SINOPEC Fourth Construction Co., Ltd.--Tianjin Branch

Other Clients
Sinopec Nanjing Engineering & Construction Inc.
Jiangsu Installation Co., Ltd.
China Chemistry Engineering No.13 Construction Limited Company
Qigong Installation Inc.
Qigong Kaixin Installation Co., Ltd.
Jiangsu Tianmu Construction Group Co., Ltd.
Jiangsu Huaneng Construction Group Co., Ltd.
Jiangsu Longhai Construction Group Co., Ltd.
Nantong Installation Corporation (Group)
Guangxi Construction Engineering Group No.1 Installation Co., Ltd.
The 13th Construction Co., Ltd. of China National Chemical Engineering-Guangdong Branch
Hebei Installation Co., Ltd.
Henan Equipment Installation Co., Ltd.
PetroChina No.1 Construction Company Limited
The Second Construction Engineering Co., Ltd-Henan Branch
Shandong Electric Power Construction No.2 Company
China Petroleum & Chemical Corporation---Xi'an Branch
China Huaneng Group---Yimin Power Plant
China Energy Engineering Group Tianjin Electric Power Construction Company
China Eleventh Chemical Construction Company Limited--Kaifeng Branch
India BGR Energy Systems Limited

Dongguang Guoxin Hydraulic Equipment Manufacture Co., Ltd.

Tel.: +86-317-7769383

Fax: +86-317-8189495